List of Projects Undertaken and Completed:

Solar Panels

222KW

Brake Parts India,

Sonipat- Haryana – Rooftop OFF GRID

350KW

Best Price Walmart, Amravati – Maharashtra – Rooftop ONGRID

350KW

Best Price Walmart, Hyderabad – Telangana – Rooftop ONGRID

1420KW

Asahi India Glass, Bawal – Haryana - Rooftop ONGRID

2000KW

Patanjali Food Park, Tezpur – Assam – Rooftop ONGRID

31KW

Western Railways, Mumbai – Maharashtra – Rooftop OFFGRID

250KW

Kalindi College, Delhi – Rooftop Off-Grid

300KW

IEC College, Greater Noida, U.P. – On-Grid Rooftop Solar Installation

100KW

Loretto School, Delhi – Rooftop Off-Grid

70KW

Kamal School, Delhi – Rooftop Off-Grid

1720KW

HAL Lucknow – U.P.

– Rooftop ONGRID

948KW

HAL Korwa – U.P.

Rooftop ONGRID

210KW

Azure Rajasthan –

Rooftop OFFGRID

1165KW

NTPC Lara – Chhattisgarh - Rooftop ONGRID

500KW

NTPC Talcher –

Orissa – Rooftop

ONGRID

1090KW

ONGC Nazaria –

Assam – Ground

Mounted ONGRID

 2600KW

EESL Dongarkada –

Maharashtra –

Ground Mounted

ONGRID 

950KW

Ordnance Factory,

Nagpur –

Maharashtra –

Rooftop ONGRID

1200KW

ITI, Kirshnarajpuram –

Karnataka – Rooftop

OFFGRID

5500KW

BHEL Ranipet –

Madhya Pradesh –

Ground Mounted

ONGRID

National Thermal Power Corporation (NTPC), Orissa

Surya Day Private Limited successfully executed an 800 kW rooftop on-grid solar power plant for NTPC Limited at its Darlipali site in Odisha.

WhatsApp Image 2025-01-17 at 2.37.50 PM.jpeg
WhatsApp Image 2025-01-17 at 2.38.01 PM.jpeg
WhatsApp Image 2025-01-17 at 2.38.01 PM.jpeg
WhatsApp Image 2025-01-17 at 2.27.47 PM.jpeg
WhatsApp Image 2025-01-17 at 2.38.10 PM.jpeg
WhatsApp Image 2025-01-17 at 1.03.24 PM.jpeg
WhatsApp Image 2025-01-17 at 1.43.03 PM.jpeg

The scope of work included:

  • Design, supply, and installation of high-efficiency solar PV modules

  • Deployment of string inverters with optimized load balancing

  • Lightweight mounting structures suitable for industrial rooftops

  • Integration with the grid as per NTPC and DISCOM norms

  • Safety, earthing, SPDs, and monitoring system implementation

This project contributes significantly to NTPC’s commitment toward sustainable and renewable energy adoption while reducing its carbon footprint. The plant is operational and delivering clean energy seamlessly to the NTPC facility.

Energy Efficiency Services Limited (EESL)

Surya Day Private Limited, as an EPC contractor for Energy Efficiency Services Limited (EESL), successfully executed the design, supply, installation, and commissioning of a 2613.60 kWp ground-mounted grid-connected solar power plant at the 33/11 KV Substation, Dongarkada (Maharashtra).

WhatsApp Image 2025-01-17 at 2.27.47 PM (1).jpeg
WhatsApp Image 2025-01-17 at 2.38.01 PM.jpeg
WhatsApp Image 2025-01-17 at 2.24.22 PM.jpeg
WhatsApp Image 2025-01-17 at 2.27.47 PM.jpeg
WhatsApp Image 2025-01-16 at 3.18.02 PM.jpeg
WhatsApp Image 2025-01-17 at 2.24.25 PM.jpeg
WhatsApp Image 2025-01-17 at 2.27.47 PM.jpeg

The project was implemented in association with MSEDCL under work order no. EESU06/2019-20/Solar PV System Integrator192006007, and was commissioned on 1st May 2021.

The scope of work included:

  • Civil foundation and erection of module mounting structures

  • Installation of PV modules, inverters, AC/DC distribution panels, and HT transformer

  • Fire protection system, CCTV surveillance, and remote monitoring integration

  • Branding elements such as EESL logos and project signage

  • Full system integration, testing, and commissioning

The project was executed in full compliance with the specified technical standards and contractual terms, and its performance has been certified as satisfactory by EESL.

Oil and Natural Gas Corporation (ONGC), Assam

Surya Day Private Limited successfully executed a 1090 kW ground-mounted on-grid solar power project for Oil and Natural Gas Corporation (ONGC) at Nazira, Assam.

WhatsApp Image 2025-01-17 at 2.42.19 PM.jpeg
WhatsApp Image 2025-01-17 at 2.38.01 PM.jpeg
WhatsApp Image 2025-01-17 at 2.42.18 PM.jpeg
WhatsApp Image 2025-01-17 at 2.27.47 PM.jpeg
WhatsApp Image 2025-01-17 at 2.42.17 PM.jpeg
WhatsApp Image 2025-01-17 at 2.42.18 PM (1).jpeg
WhatsApp Image 2025-01-17 at 2.42.16 PM (1).jpeg

The project involved:

  • Supply and installation of high-efficiency solar PV modules

  • Ground-mounted structure design with optimized layout

  • String inverters for maximum yield and grid compliance

  • Remote monitoring system and SCADA integration

  • Complete civil, electrical, and safety infrastructure

Commissioned to power ONGC’s operational units sustainably, the plant contributes significantly to the organization’s green energy portfolio and carbon reduction objectives. The project was delivered within the specified timeline and in full compliance with ONGC’s quality and safety standards.

NTPC, Madhya Pradesh

Surya Day Private Limited successfully executed the design, supply, installation, and commissioning of an 80 kW rooftop off-grid solar power plant for NTPC Limited. The project was implemented to support uninterrupted power supply for NTPC’s critical operational and administrative facilities.

WhatsApp Image 2025-01-14 at 12.49.46 PM.jpeg
WhatsApp Image 2025-01-17 at 2.38.01 PM.jpeg
WhatsApp Image 2025-01-14 at 12.49.27 PM.jpeg
WhatsApp Image 2025-01-17 at 2.27.47 PM.jpeg
WhatsApp Image 2025-01-14 at 12.49.46 PM (1).jpeg
WhatsApp Image 2025-01-14 at 12.49.22 PM.jpeg
WhatsApp Image 2025-01-14 at 12.49.26 PM.jpeg

The system was engineered to include:

  • High-efficiency Polycrystalline solar modules

  • MPPT-based OFFGRID inverter system

  • Lead-Acid battery bank for extended backup

  • Intelligent energy management and protection systems

The plant ensures clean, reliable, and self-sustained electricity, significantly reducing diesel generator dependency and contributing to NTPC's renewable energy goals. The project was completed within the stipulated timeline and fully adheres to the technical standards laid out by NTPC and MNRE.

1.png
6.png
9.png
3.png
10.png
8.png
7.png
5.png
4.png
2.png

Projects Gallery

c2f641f7-9fe9-4ac2-9ad0-9f111f9353c1.JPG
6b7a1e29-8e10-401c-a066-3ee5646b7d20.JPG
WhatsApp Image 2025-07-09 at 3.33.52 PM.jpeg
9cf0424d-e018-4e44-ae39-b4a115e945e0.JPG
744a54d2-46a0-4b9f-b57a-cd4c504a492e.JPG
9491c4ee-7d0a-4bab-9ef7-448f7c4ee2f5.JPG
f824dea5-0a38-49c7-8eed-fbe5cb668c4c.JPG
e23f5bd5-cf6f-4117-a4a5-f9e86cf468c1.JPG
bottom of page